
Engineering Solution Library
Start with the project constraint.
Find the engineering path for span, cranes, site loads, corrosion, envelope performance and export delivery.
Choose by engineering challenge
Six paths into a focused technical discussion.
Choose the constraint that most affects the building. The detail panel shows the first information Ganyo needs for a useful review.

Large Clear-Span Steel Buildings
Plan column-free operations around span, clear height, roof geometry and future use.
Open solution ↗
Crane-Ready Steel Workshops
Coordinate crane capacity, lifting height, duty conditions and structural interfaces early.
Open solution ↗
Wind, Snow & Seismic Design Inputs
Define site and code information before engineering review begins.
Open solution ↗
Corrosion Protection for Steel Buildings
Match environmental exposure, surface preparation and maintenance planning.
Open solution ↗
Insulated Steel Building Envelopes
Coordinate roof, wall, insulation, condensation and finish requirements.
Open solution ↗
Export Delivery & Site Assembly Coordination
Align packaging, container loading, destination constraints and assembly responsibilities.
Open solution ↗
01Clear span discussion basis
Large Clear-Span Steel Buildings
A clearer structural planning basis for the required open interior.
- Building use
- Required clear span
- Clear height
- Expansion plan
Before the first design discussion
Eight inputs turn a building request into a usable brief.
Unknown values are acceptable. Mark them for review instead of replacing them with assumptions.
Open project brief ↗- 01Building use
Production, storage, logistics or mixed use
- 02Dimensions
Length, width, clear span and clear height
- 03Site basis
Country, region, wind, snow and seismic inputs
- 04Equipment
Crane, machinery and operating clearances
- 05Envelope
Roof, wall, insulation and condensation needs
- 06Exposure
Marine, industrial, humid or other conditions
- 07Delivery
Port, container and road-access constraints
- 08Assembly
Local team, supervision and responsibility split
Specialist guides
Two practical decisions that support the main Solution paths.
Department knowledge stays easy to find without competing with the six engineering categories.

Steel Building Color Selection
Confirm painted structure, roof, walls, doors and windows as separate component decisions before production.
Open specialist guide ↗
Steel Building Container Loading Methods
Compare open-top, bulk-loaded 40HQ and packing-rack methods with destination unloading conditions.
Open specialist guide ↗Project evidence
Connect every solution to a built-project context.
Coordination sequence
Move from project constraints to an executable supply brief.
- 01Define use and constraints
Record the intended use, dimensions, location and operating requirements.
- 02Review engineering inputs
Check loads, crane data, envelope performance and exposure conditions.
- 03Coordinate supply scope
Align steelwork, accessories, packaging, drawings and responsibility boundaries.
- 04Plan delivery and assembly
Carry the approved information into container, destination and site coordination.
Start a technical discussion
Bring the project constraints, not only a building name.
Choose a Solution, record what is known and identify the inputs that still need review.






